Deck Footing Calculator

Plan a regular footing grid and optionally estimate cylindrical concrete volume and bags.

Measurement units

Example measurements. Replace the sample values with your own project measurements before calculating.

Plan the footing layout

Use the run length, number of rows, and maximum spacing to estimate a regular footing grid.

Adds a practical buffer for cuts, settling, or overlap.

Advanced settingsProduct coverage, packaging, and optional pricing

Concrete planning

Optional. Add a cylindrical footing size and bag yield to estimate concrete purchasing quantity.

Optional. Added once to the estimate.

How this deck footing estimate works

Use this calculator for a regular footing grid during early deck planning. It keeps the layout count separate from optional concrete volume so you can review the grid before making structural or excavation decisions.

How to measure

  1. Measure the run length covered by one row of footings.
  2. Enter the number of footing rows and the maximum spacing for each row.
  3. Open Advanced settings for an optional footing diameter, depth, bag yield, and price comparison.

How the estimate works

Divide run length by maximum spacing and round up to whole spaces. Add one to get footings per row, then multiply by the row count.

Worked example

A 20 ft run at 6 ft maximum spacing has 4 spaces and 5 footings per row. Two rows produce 10 footings before any concrete calculation.

Before you buy

If you enter footing size and bag yield, use the result to compare material quantities. Confirm excavation access, inspection needs, frost depth, and the framing plan first.

Package and supplier details

Soil, frost, loads, beams, drainage, permits, footing shape, bag yield, and local structural requirements can change the final plan.

Assumptions

  • Each row uses the same run length and maximum spacing.
  • Rows are regular and have the same footing count.
  • Concrete volume is optional and uses simple cylindrical footings.

Limitations

This is a planning and layout estimator only. It does not design footings, verify loads, choose depth, or replace permit and structural review.

Questions about deck footing

What does footing row count mean?

It is the number of parallel rows in the grid. Enter the rows shown in your early deck layout.

Can I use the concrete result as a footing design?

No. The optional volume is for material planning from a cylinder size you enter. Frost, soil, loads, and local rules still control the design.

Why does changing maximum spacing change the count?