How to measure
- Measure the run length covered by one row of footings.
- Enter the number of footing rows and the maximum spacing for each row.
- Open Advanced settings for an optional footing diameter, depth, bag yield, and price comparison.
Plan a regular footing grid and optionally estimate cylindrical concrete volume and bags.
Use this calculator for a regular footing grid during early deck planning. It keeps the layout count separate from optional concrete volume so you can review the grid before making structural or excavation decisions.
Divide run length by maximum spacing and round up to whole spaces. Add one to get footings per row, then multiply by the row count.
A 20 ft run at 6 ft maximum spacing has 4 spaces and 5 footings per row. Two rows produce 10 footings before any concrete calculation.
If you enter footing size and bag yield, use the result to compare material quantities. Confirm excavation access, inspection needs, frost depth, and the framing plan first.
Soil, frost, loads, beams, drainage, permits, footing shape, bag yield, and local structural requirements can change the final plan.
This is a planning and layout estimator only. It does not design footings, verify loads, choose depth, or replace permit and structural review.
It is the number of parallel rows in the grid. Enter the rows shown in your early deck layout.
No. The optional volume is for material planning from a cylinder size you enter. Frost, soil, loads, and local rules still control the design.
The run is divided into enough whole spaces to stay within the maximum. A smaller maximum usually creates more spaces and footings.
Short, practical help for the next step in this project.