Formula
Footings per row = round run length ÷ maximum spacing up + 1. Total footings = footings per row × row count.
Plan a regular footing grid and optionally estimate cylindrical concrete volume and bags.
A regular grid is useful for early deck planning, especially when comparing framing options. Keep the layout estimate separate from the structural and frost-depth decisions.
Footings per row = round run length ÷ maximum spacing up + 1. Total footings = footings per row × row count.
A 20 ft run at 6 ft maximum spacing has 4 spaces and 5 footings per row. Two rows produce 10 footings before any concrete calculation.
If you add a footing diameter and depth, use the result to compare bag yield or delivery quantities. Confirm excavation access and inspection requirements first.
Defaults are starting points. Replace coverage, density, package yield, spacing, and allowance values with the product or plan you are actually using.
This is a planning/layout estimator only. Frost, soil, loads, beams, drainage, permits, and local structural requirements need separate review.